Project Background Mantra Services was recently commissioned to provide pre-construction, delivery phase quantity surveying and commercial management services to a UK Main Contractor. Working in conjunction with the client’s internal teams, the appointment required us…
Category: Project
Underground Utility Survey London
Project Background Mantra Services was recently commissioned to carry out a detailed topographical survey for an infrastructure upgrade and carriageway regeneration project in the centre of London. Project Challenges and Our Response Within a busy part of…
Topographic Survey Suffolk Business Park Development
Project Background Mantra Services was recently commissioned to carry out a detailed topographical survey for a Business Park Development in Newmarket. Project Challenges and Our Response. Specific challenges to this project were busy highways areas in and out…
Large UK International Airport
Project Background Mantra Services has completed a number of topographical and utility surveys at a UK International Airport. This multiple project commission included temporary contractors’ compounds and site set ups, a “front of house” Express Set Down project, the Valet Parking…
Multiple Large Water Treatment Works Perimeter Surveys
Project Background Mantra Services were commissioned to undertake a detailed Topographical survey and PAS128 compliant utility survey around the perimeter of 4 large Water Treatment Works. The total perimeter length of the 4 sites was…
On Site Marking Out, Nationwide
Project Background Mantra Services was commissioned on a programme of works to complete multiple site surveys and on site marking out to establish space for mobile phone towers and equipment to be located. The surveys…
Home Counties Dilapidation Surveys
Project Background Mantra Services was commissioned to carry out non-intrusive photographic dilapidation’s surveys across a 70+ multi-site programme within the home counties. The scope was to report on the general condition of the site and…
South of England Dilapidation Surveys
Project Background Mantra Services was commissioned to carry out non-intrusive photographic dilapidation’s surveys across a 150+ multi-site programme across the South of England. Working closely with the client to provide a bespoke reporting template, Mantra…
As Built Surveys
Project Background Mantra Services was recently commissioned to complete full as-built topographical surveys to newly installed infrastructure projects at 3 locations across the South Coast of England. The full scope consisted of a full GPS…
As Built Surveys
Project Background Mantra Services was recently commissioned to complete as-built ducting and civils infrastructure surveys to over 80 assets across the Home Counties area. The full scope consisted of a GPS topographical survey to include…